Clarendon Avenue, Leamington Spa
Full Details
COMMUNAL HALLWAY
Accessed via a security intercom into the foyer with tiled flooring, lifts to all floors, electricity meter cupboard, seating area and an easy tread staircase. The apartment in located on the first floor landing.
RECEPTION HALLWAY
With a radiator, coat hanging, downlighters, display cabinet and a built in double cupboard housing the central heating boiler and further doors off to
LOUNGE 6.17m max x 5.67m max
With two full height double glazed windows to the fore with blinds, downlighters, radiator, corner sofa, chest, display cabinet and tv stand with flat screen tv. There is a dining area with radiator and a four seater table and chairs.
FITTED KITCHEN 1.94m x 3.27
Fitted with a red high gloss range of wall and base units. The worksurface has a stainless steel sink unit with mixer taps, four ring gas hob, double oven and microwave oven. Integrated washing machine/tumble dryer, fridge freezer and a dishwasher. Tiled floor and splashbacks.
BEDROOM ONE 4.10m x 2.98m
With double glazed windows looking onto the park, radiator, double bed with bedside cabinet, chest of drawers and an occasional chair. Fitted sliding wardrobes and a door into the en suite.
EN SUITE SHOWER ROOM
Fitted with a shower cubicle with a thermostatic shower, pedestal wash hand basin and a close coupled wc. Tiled flooring and splashbacks. Heated towel rail and downlighters.
BEDROOM TWO 3.00m x 3.32m
Double glazed windows to the fore, radiator, two chest of drawers, pull out single/double bed, wardrobe and downlighters.
BATHROOM
Fitted with a white suite that comprises a panelled P shaped bath with mixer shower and screen, concealed cistern wc and a pedestal wash hand basin. Tiling to floor and full height to splashbacks. Downlighters, extractor fan and a heated towel rail. A storage cabinet.





















